The Integrated or Moving Rate is the mean of all the samples in the preceding integration period. Up to 10 minutes integration is available. Increase the integration period to smooth out short-term fluctuations.
(click/tap to zoom)
Shown below are different stages of a long-term power reserve test (Pro Upgrade). Because the test is started at 6:00 AM
watch time, the date change effect can be seen around T+18, T+42, and T+66 hours. The long-term effects of the
mainspring unwinding can also be observed, with a drop in power and accuracy during the last couple of hours.
This watch performs remarkably well, staying within ± 5.2 S/D for nearly 80 full hours!
(click/tap to zoom)
A time lapse screen recording of the same test: